Project number:CZ.01.3.10/0.0/0.0/20_370/0026059
Operation goal:Increase the energy efficiency of the business sector to drive sustainable growth and innovation.
The purpose and goal of this project is to modernize the entire electrical distribution system of the MOTOR JIKOV Group a.s. manufacturing site in České Budějovice. This will include the replacement of existing transformers and switchgear within the current transformer station buildings, along with related upgrades to high-voltage (VN) and low-voltage (NN) lines.
+125
years in the market
Kickstart your career at Motor Jikov – take a look at our job openings and get in touch with us.
MOTOR JIKOV Group a.s. company utilizes the opportunity to draw funds from European program grant resources.